Construction measurement technology of rock tunnel;
淺談巖石隧道施工測量技術(shù)
The shallow analysis of the measures in soft rock tunnel water prevention;
寒區(qū)巖石隧道防水措施淺析
Therefore, in the study of cold region rock tunnel, to avoid and reduce freezing damage,the key issue is to study the occurance、expansion and the prevention of the frost heaving force.
利用ANSYS有限元對寒區(qū)隧道凍脹力進(jìn)行了數(shù)值模擬,通過對理論計算結(jié)果和數(shù)值模擬結(jié)果的比較分析,提出寒區(qū)隧道凍脹力的基本防治措施,對寒區(qū)巖石隧道工程的設(shè)計和施工具有指導(dǎo)意義。
Study of Cutter Layout Design of Full-face Rock Tunnel Boring Machine
全斷面巖石隧道掘進(jìn)機(jī)刀盤刀具布置方法研究
Structure Analysis on Rock Tunnel Boring Machine Pipe Liner;
巖石掘進(jìn)機(jī)隧道管片襯砌的結(jié)構(gòu)分析
Mechanical Analysis for Main Frame of Railway Soft Rock Tunnel Roadheader;
鐵路軟巖隧道臂式掘進(jìn)機(jī)主機(jī)架力學(xué)特性分析
Study on Mechanical Behavior of Metro Tunnel Construction by Tunnelling Machine in Weak-Broken Surrounding Rock
軟弱破碎圍巖地鐵隧道掘進(jìn)機(jī)施工力學(xué)研究
coal or rock cutter and tunneling machinery ,self-propelled
截煤或截石機(jī)和隧道挖掘機(jī)械,自動推進(jìn)
coal or rock cutter and tunneling machinery ,not self-propelled
截煤或截石機(jī)和隧道挖掘機(jī)械,非自動推進(jìn)式
On construction of TBM machine in tunnel
淺談硬巖雙護(hù)盾掘進(jìn)機(jī)(TBM)隧洞施工
pattern recognition of full face TBM boring performance
全斷面隧道掘進(jìn)機(jī)掘進(jìn)狀況分類識別研究
Study on Pattern Recognization of Tbm Boring Performance of Qinling Tunnel;
秦嶺隧道全斷面掘進(jìn)機(jī)掘進(jìn)狀況識別分析研究
Fuzzy identification of surrounding rock conditions based on analysis of shield tunneling data
基于盾構(gòu)掘進(jìn)參數(shù)分析的隧道圍巖模糊判別
Operation principle analysis of disc cutter on TBM
隧道掘進(jìn)機(jī)盤形滾刀的工作原理分析
Alteration of Control System for Power of TB880E-type TBM
TB880E型隧道掘進(jìn)機(jī)控制系統(tǒng)電源改造
Study on the Consecutive Boring Principle of the Open Type Full Face Rock Tunnel Boring Machine;
敞開式全斷面巖石掘進(jìn)機(jī)連續(xù)掘進(jìn)原理的研究
Investigation of rock cutting mechanism of disc cutter of fullface development machine
全斷面巖石掘進(jìn)機(jī)盤形滾刀破巖機(jī)理的探討
Improvement of Motor Waterproof of Dust-exhaust System of TB880E-type TBM
TB880E型隧道掘進(jìn)機(jī)除塵系統(tǒng)電機(jī)防水的改進(jìn)
Shields that are modification of the one that Brunel developed for boring the Thames Tunnel are used in excavating through clay or soft rock.
布魯內(nèi)爾在挖掘泰晤士河隧道時所發(fā)明的盾構(gòu)加以改進(jìn)后用于在粘土和軟巖地帶挖掘隧道。
Set up the TBM Industries for Promoting the Underground Space Development in China
建立隧道掘進(jìn)機(jī)產(chǎn)業(yè) 促進(jìn)我國地下空間開發(fā)
Theoretical Analysis of Special Section Tunnel Cutting Mechanism of Shield Machine;
盾構(gòu)掘進(jìn)機(jī)異形斷面隧道切削機(jī)構(gòu)的理論研究